To provide Technical Assistance to Iğdır Municipality and the Project Implementation Unit (PIU) through administrative and technical capacity building, modernisation of the Water Utility Department, and assisting the Municipality in setting up and operating an efficient water and wastewater department (Water Utility Department).Provision of construction supervision for the wastewater collection system according to FIDIC Red Book and for the wastewater treatment plant according to FIDIC Yellow
OPTIMAL provides technical services for;
• Technical assistance to the WUD and PIU in performance of leakage detection and Non-Revenue Water Reduction Programme,
• Preparation of Sludge Management Plan to assess the final usage alternatives of the sludge produced at the WWTP,
• Complete engineering design for WWTP,
• Construction of 11,132 m3/d average flow rate capacity WWTP,
• Training, operation and maintenance,
• 55 km water transmission lines, 2 Spring Catchment chambers
• 3 Collecting chambers for the water sources, 4 new water reservoirs (500 m3, 1000 m3, 1500 m3 and 5000 m3),
• 2 new water pumping stations and 6.5 km forced mains and rehab. of 1 water pumping station,
• 725 m Service roads,
• 963 m creek crossing structure and 15 m highway horizontal drilling and 300 m creek and canal crossing by hanging pipe on bridge
• Rehabilitation of 3 existing water reservoirs,
• 85 km of sewer mains and supply, 32 km wastewater house connection pipes and 4518 parcel manholes and 2259 manholes,
• Installation of automation system for water distribution & existing pumping stations.• 725 m Service roads,
• Construction of 3 wastewater pumping stations
• Construction of approx. 2100 m wastewater force mains
• Construction of reinstatements Supply and installation of mechanical, electrical, instrumentation, control, automation communication
equipment and related devices automation communication equipment and related devices,Training, operation and maintenance