The Project is established within the existing university campus land consisting of 20.000 sqm enclosed space. Within the seismic mitigation program of Istanbul Governorship, existing sport complex will be demolished and a new Sports Complex will be built along with a Conference Hall. Sport Complex is specifically designed to be able convert into an Emergency Collection Station and Temporary Accommodation Building in case of an Earthquake or any other relevant disaster. From this perspective, the project is well studied together with AFAD (Disaster and Emergency Management Presidency). Further to Superstructure design, the whole car trafficking of the campus has been taken down to underground.
OPTIMAL provides Design and Supervision services;
• Investment Feasibility (Best Use Analysis)
• Investment Financial Planning
• Conceptual Development
• Performing the Multi-Disciplinary Design
• Performing Value Engineering
• Producing the Contractors Tender Packages
• Site Supervision Services
• Monitoring the Work Program
• Monitoring the Overall Investment Budget
• Monitoring the Quality